scroll
Al Hamriyah Sea Water RO Plant
United Arab Emirates
Project summary
24 racks of 120 HYDRAcap60 modules (2,880 in total) are producing 228 Ml/d (61 mgd) from an open intake sea water. The UF membranes didn’t receive a CIP cleaning until 2017. The membrane skids are delivering directly in line high quality permeate water to eight trains of spiral wound RO membranes for seawater desalination.
Start-up date: May 2014 by Hydranautics
Start-up date: May 2014 by Hydranautics
Downloads
-
HYDRAcap™ brochure